9,357 MW
estimated power demand of complete AI systems shipped in 2023–2024, above the national demand of Austria (7.2 GW) or Finland (9.0 GW)

What the chart shows

Counting the full systems around AI chips (servers, cooling and networking), hardware shipped in 2023 and 2024 draws an estimated 9,357 megawatts: 2,561 MW from 2023 and 6,797 MW from 2024.

Nvidia-based systems account for 4,764 MW. The total is more than the national electricity demand of Austria or Switzerland and close to Finland’s (related chart).

Key numbers

MeasureValue
Cumulative, all9,357 MW
Cumulative, Nvidia4,764 MW
Cumulative, AMD528 MW
Shipped in 20246,797 MW
Shipped in 20232,561 MW

How to read it

  • Estimates by de Vries-Gao (2025), with uncertainty from assumptions about utilisation and shipments.
  • The AI Index’s printed chart titles for figures 1.4.9 and 1.4.10 appear to be swapped; numbering here follows the report text and data files.
Source: de Vries-Gao, 2025, via the AI Index Report 2026 (Stanford HAI), figure 1.4.10: Estimated power demand of all-in AI systems. Chart and text by AI Adoption.
Numbers checked against the published data on 19 October 2026.
Download the data (CSV) · Cite this chart